Featured Articles

  • , ,
    Data centre noise 101 for project teams, where the noise actually comes from
    September 14, 2026
    Most data centre noise summaries are written as a list of equipment. Chillers, cooling towers, fans, transformers, generators. The list is accurate and not especially useful, because it does not…
    Learn More
  • Sonic Series acoustic louvres, retrofit into a wall
    , ,
    Noise risk and community acceptance in BESS project design
    July 3, 2026
    Battery energy storage systems are one of the fastest-growing infrastructure categories in Australia. As installations increase in scale and move closer to residential and rural communities, acoustic performance is becoming…
    Learn More
  • AcousTech Sonic System enclosures
    ,
    The new acoustic challenge of hyperscale data centres
    July 1, 2026
    The acoustic profile of a hyperscale data centre bears little resemblance to the industrial facilities that informed the noise control frameworks most engineers have historically applied to large-scale mechanical plant….
    Learn More

All Articles

Industries
  • AcousTech Sonic System acoustic modular panels installed as a large noise barrier beside the North East Link Tunnel construction site, with traffic and industrial infrastructure in the foreground.
    , ,
    From model to commissioning, closing the acoustic performance gap
    November 20, 2026
    An acoustic model produced at the design stage of an infrastructure project is only as reliable as its assumptions, and those assumptions have to survive procurement, fabrication, installation and every…
    Learn More
  • Industrial facility featuring green Sonic Access acoustic doors, electrical enclosures and large cylindrical processing equipment, with safety signage and access provisions.
    ,
    What NATA-accredited acoustic data tells a specifier and what it does not
    November 16, 2026
    A NATA-accredited test report is one of the strongest pieces of evidence in acoustic testing and specification, and one of the most often misread. Accreditation confirms something specific about the…
    Learn More
  • AcousTech Sonic acoustic enclosures installed over water treatment equipment, with two maintenance workers accessing machinery inside an enclosure at a wastewater treatment facility.
    , , , , ,
    Design for maintainability, keeping acoustic treatments workable over the asset life
    November 13, 2026
    An acoustic enclosure that meets its target reduction on commissioning day has only shown part of what it has to do. Industrial plant is serviced, inspected, adjusted and eventually replaced…
    Learn More
  • arge green Sonic Access acoustic double doors installed beneath a gantry crane structure at an industrial facility, providing access through a brick building wall.
    , , ,
    Service penetrations and acoustic integrity, small openings, large consequences
    November 9, 2026
    An acoustic wall, enclosure or plant room separation is specified and tested as a continuous assembly, and it rarely stays continuous once services go in. Cable trays, conduits, pipes, ducts…
    Learn More
  • Sonic acoustic enclosure with open access doors surrounding industrial water pipework and valves, showing acoustic panel construction at a water treatment facility.
    , , , , , ,
    Flanking paths, why tested acoustic performance can disappear after installation
    November 6, 2026
    An Rw rating from laboratory testing is real, and it describes what an element achieves under the conditions it was tested in. It doesn’t automatically describe what the same panel,…
    Learn More
  • Industrial centrifugal blower with electric motor beside a Sonic acoustic enclosure and acoustic barrier panels at a water treatment facility.
    , , , ,
    Acoustic walls and enclosures, how to decide which approach fits the plant
    November 2, 2026
    Whether a noisy piece of plant gets an acoustic wall or a full acoustic enclosure is often settled on budget, with the enclosure cast as the better option and the…
    Learn More
  • Noise modelling is only as good as its inputs, five data gaps that change project outcomes
    October 30, 2026
    Environmental noise prediction has become very good. The calculation methods are standardised, the software implementations are mature, and two competent practitioners given the same inputs will produce closely comparable results….
    Learn More
  • ,
    Cumulative noise, what happens when every plant item meets its individual target
    October 26, 2026
    A specification requires that no individual item of plant exceed 45dB(A) at the nearest receiver. Eight items are installed. Every one is measured at commissioning and every one complies. The…
    Learn More
  • ,
    Emergency generators, the short-duration noise source that can dominate a data centre assessment
    October 23, 2026
    A common position in early data centre planning runs roughly as follows. The generators are for emergencies. They will run perhaps twenty hours a year. Continuous mechanical plant is the…
    Learn More
  • , ,
    Designing generator intake and discharge paths without creating an acoustic weak point
    October 19, 2026
    A generator enclosure is an unusual acoustic object. Almost every other enclosure on a project is trying to be closed. This one has to move an enormous volume of air…
    Learn More
  • , ,
    Attenuator sizing, balancing insertion loss, airflow and pressure drop
    October 16, 2026
    An attenuator selection sheet usually contains two numbers that people look at and one that decides whether the selection works. The two are insertion loss and pressure loss. The one…
    Learn More
  • , ,
    When an acoustic louvre is the right choice and when it is not
    October 12, 2026
    An acoustic louvre is asked to do three incompatible things through the same aperture. It has to let air through, keep water out, and attenuate sound. Each of those improves…
    Learn More
  • Insertion loss, transmission loss and Rw, choosing the right metric for the job
    October 9, 2026
    A mechanical engineer sizing a duct attenuator, an architect specifying a plantroom wall and a project manager reviewing a supplier submission can all be looking at a number followed by…
    Learn More
  • , , ,
    The acoustic specification brief, what consultants need from suppliers at tender stage
    October 5, 2026
    Three suppliers return prices against the same acoustic scope. The spread is forty per cent. Procurement reads that as a commercial finding, asks the lowest bidder to confirm compliance, receives…
    Learn More
  • ,
    Tonal noise in BESS, why a compliant dB(A) figure may not tell the whole story
    October 3, 2026
    An overall A-weighted level answers one question. How much acoustic energy arrives at the receiver, weighted roughly for the sensitivity of human hearing. It does not answer the question residents…
    Learn More
  • ,
    Designing BESS sites for social licence, what noise planning can contribute
    October 2, 2026
    In August 2026 the ABC reported on community concern about a proposed 520 megawatt battery energy storage facility at Uriarra Station in the Australian Capital Territory, around two kilometres from…
    Learn More
  • , ,
    BESS noise 101, fans, chillers, inverters and transformers explained
    September 28, 2026
    Battery energy storage is often described as quiet technology, and at the cell level that is true. There is no combustion, no reciprocating machinery and no prime mover. Everything around…
    Learn More
  • , ,
    BESS noise starts with source data, what to request from OEMs before procurement
    September 25, 2026
    A published noise impact assessment for a battery energy storage project at Glen Innes in northern New South Wales contains a sentence that should be read carefully by anyone procuring…
    Learn More
  • , ,
    Why rooftop plant changes the noise risk for data centres
    September 21, 2026
    Putting heat rejection plant on the roof is usually a sound decision. It frees ground level area for electrical infrastructure and access, it shortens pipe runs, it keeps plant away…
    Learn More
  • Acoustic treatment during install
    ,
    Acoustic headroom, the design allowance that protects future data centre expansion
    September 18, 2026
    Data centre projects reserve capacity as a matter of course. Electrical infrastructure is sized with spare feeder capacity. Cooling is designed with redundancy and a growth path. Structure is built…
    Learn More
  • , ,
    Data centre noise 101 for project teams, where the noise actually comes from
    September 14, 2026
    Most data centre noise summaries are written as a list of equipment. Chillers, cooling towers, fans, transformers, generators. The list is accurate and not especially useful, because it does not…
    Learn More
  • Data centre boom
    , , ,
    What Australia’s data centre boom means for acoustic design before DA submission
    September 11, 2026
    In August 2026 the NSW Government published the NSW Data Centre Guidelines, which record around 60 data centres already operating in the state and 19 projects in the State Significant…
    Learn More
  • Sonic Access acoustic doors on a pump station
    Infrastructure projects are being asked to do more than ever before
    August 31, 2026
    The requirements attached to infrastructure projects have multiplied. A road project is also a noise abatement project, a biodiversity offset project, and a social procurement project. A water treatment upgrade…
    Learn More
  • Sonic acoustic enclosure
    ,
    The infrastructure pipeline is growing. The approval pipeline is not.
    August 28, 2026
    There is more infrastructure in planning across Australia right now than at any point in the past twenty years. Defence, energy, resources, water, transport, and digital infrastructure are all in…
    Learn More